Program planned on November 28, 2003: ===================================== The following jobs are ready to be submitted once westgrid is up and running, the time is estimated assuming 400 CPUs available for TWIST: time estimate (hours) Status Studies on set B (set3): Use 1850 V STR file 5 completed Use temp=270K STR file 5 completed Use foil position = 2.2 mm STR file 5 completed Turn classification off 5 completed ===> 20 MC analysis on standard set (gen19): Use 1850 V STR file 4 completed Use temp=270K STR file 4 completed Use foil position = 2.2 mm STR file 4 completed Turn classification off 4 completed ===> 16 MC generation with wire dead zone (gen28) 8 completed MC analysis of gen28 4 completed ===> 12 Systematics data sets (will be transfered once Westgrid is up) Slightly upstream muon stops (set4) 5 completed Slightly downstream muon stops (set5) 5 completed DC HV = 1850 (set6) 1850 V STR file 5 completed 1950 V STR file 5 completed ===> 20 Total time ===> 68 hours Program planned on Dec 5, 2003: =============================== Time estimates (please see web page for a description of these sets) Monte Carlo gen 29 generation 2 completed analysis 1 completed gen 30 generation 2 completed analysis 1 completed gen 31 generation 2 completed analysis 1 completed gen 32 generation 2 completed analysis 1 completed gen 33 generation 8 completed analysis 4 completed ===> 24 hours Data set 7 5 completed set 8 5 completed set 9 5 completed set 10 5 completed ===> 20 hours Total time ===> 44 hours + incomplete jobs from previous list(~8 hours) Program planned on Dec 11, 2003: ================================ Monte Carlo gen 34 generation 8 completed analysis 4 completed gen 35 generation 8 completed analysis 4 completed gen 36 generation 8 completed analysis 4 completed ===> 36 hours Data set 11 5 completed set 12 (2003 data) 5 completed set 13 (2003 data) 5 completed set 14 (2003 data) 5 completed ===> 25 hours Total time ===> 61 hours + incomplete jobs from previous list (~6 hours) Program planned on Dec 12, 2003: ================================ Monte Carlo gen 37 generation 5 completed analysis 3 completed gen 38 generation 2 completed analysis 1 completed gen 39 generation 5 completed analysis 3 completed gen 40 generation 5 completed analysis 3 completed gen 41 generation 5 completed analysis 3 completed gen 42 generation 5 completed analysis 3 completed gen 43 generation 5 completed analysis 3 completed (possible problems) gen 44 generation 5 completed analysis 3 completed gen 45 generation 5 completed analysis 3 completed ===> 67 hours + incomplete jobs from previous list (~25 hours) Program planned on Dec 18, 2003: ================================ Monte Carlo gen46 generation 2 completed analysis 1 completed gen47 generation 2 completed analysis 1 completed gen48 generation 10 completed analysis 5 completed gen20 analysis(anal7) 5 completed ===> 26 hours Data set3 set3/anal11 6 completed set3/anal12 6 completed ===> 12 hours ===> 38 hours + incomplete jobs from previous lists (~30 hours) Program planned on January 7, 2004: =================================== Monte Carlo gen20/anal8 6 completed gen20/anal9 6 completed gen20/anal10 6 completed gen51 generation 12 completed analysis 6 completed gen51 generation 12 completed analysis 6 completed Data set3/anal13 6 completed set15/anal1 6 completed ===> 48 hours Program planned on January 26, 2004: ==================================== Monte Carlo gen53 generation 12 completed analysis 6 completed gen54 generation 12 completed analysis 6 completed gen41 1000 more runs (for a total of 2000) generation 6 1612 runs gen analysis 3 1000 runs anal gen42 1000 more runs (for a total of 2000) generation 6 1420 runs gen analysis 3 1000 runs anal gen43 1000 more runs (for a total of 2000) generation 6 1996 runs gen analysis 3 1000 runs anal gen44 1000 more runs (for a total of 2000) generation 6 1498 runs gen analysis 3 1000 runs anal gen45 1000 more runs (for a total of 2000) generation 6 1511 runs gen analysis 3 1000 runs anal ===> 81 hours Program planned on January 29, 2004: ==================================== Monte Carlo gen56/anal1 analysis 6 in progress gen57 xixidelta derivative for gen56 generation 4 not started analysis 2 gen58 xidelta derivative for gen56 generation 3 not started analysis 1 gen20/anal14 analysis with inhomogenous field 6 completed gen20/anal15 2000 more runs (for a total of 4000) generation 12 completed analysis 6 completed gen59 unform B for positrons only generation 12 not started analysis 6 Data set3/anal19 analysis with inhomogenous field 5 completed set16/anal1 analysis of PC HV 100 V lower 5 not started ====> 68 hours +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Westgrig offline for upgrades for 4 weeks. Back online March 1st. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ Program planned on February 27, 2004: ===================================== Monte Carlo gen61 uniform B for positrons only generation 12 completed gen61/anal1 standard analysis w/FG KO 6 gen70 New MC high stats base set with all MC vertex info generation 24 completed gen70/anal1 Analysis with FG KO 12 completed gen70/anal2 Analysis with FG Jim 12 completed gen70/anal3 Analysis with both FG KO & Jim 12 completed gen70/anal4 All event classes written to the trees 12 completed gen71 derivative for gen70 generation 2 completed gen71/anal1 analysis with FG KO 2 completed gen72 derivative for gen70 generation 2 completed gen72/anal1 analysis with FG KO 2 completed gen73 derivative for gen70 generation 2 completed gen73/anal1 analysis with FG KO 2 completed gen74 derivative for gen70 generation 2 completed gen74/anal1 analysis with FG KO 2 completed gen65 2 x muon and positron rates in MC generation 12 completed gen65/anal1 analysis with FG KO 6 completed gen66 4 x muon and positron rates in MC generation 12 completed gen66/anal1 analysis with FG KO 6 completed ====> 126 hours ++++++++++++++++++++++++++++++++++ CPUs available for TWIST reduced ++++++++++++++++++++++++++++++++++ Program planned on March 5, 2004: ================================= Monte Carlo gen70/anal5 new FG KO 24 completed gen63 standard set with 2003 settings generation 24 completed gen63/anal1 12 completed standard analysis with FG KO gen64 no wires in PCs or DCs generation 24 completed gen64/anal1 standard analysis with FG KO 12 completed ====> 96 hours Program planned on March 10, 2004: ================================= Monte Carlo gen67 95% DC efficiency generation 24 completed gen67/anal1 analysis with FG KO 12 completed gen68 reduce gamma cut-off 24 completed gen68/anal1 analysis with FG KO 12 completed gen69 reduce delta-threshold to 10 keV 24 completed gen69/anal1 analysis with FG KO 12 completed gen75 95% PC efficiency 24 completed gen75/anal1 analysis with FG KO 12 completed gen70/anal6 24 completed analysis with new FG KO and inhomo field gen70/anal7 24 completed all event types analyzed Data set3/anal20 12 completed analysis with low stats time zero file ===> 200 hours Program planned on March 12, 2004: ================================== Data set3/anal21 12 completed analysis with march 2004 FG KO set16/anal1 B2 + 10 G 12 completed set17/anal1 B2 - 10 G 12 not started ===> 36 hours + 84 hours from previous plan Program planned on March 16, 2004: ================================== Data set3/anal22 inhomogenous field and 2004 FG KO 12 completed set3/anal23 analysis with January 2004 FG Jim 12 not needed set7/anal2 DS Al: analysis of all event types 12 not needed set9/anal2 DS Al: analysis of all event types 12 completed set7/anal3 DS Al: FG KO 12 not needed set9/anal3 DS Al: FG KO 12 completed Monte Carlo gen61/anal2 analysis with new FG KO 12 completed Program planned on March 18, 2004: ================================== gen71/anal2 march 2004 FG KO 5 completed gen72/anal2 march 2004 FG KO 5 completed gen73/anal2 march 2004 FG KO 5 completed gen74/anal2 march 2004 FG KO 5 completed gen71/anal3 inhomo field & FG KO 5 completed gen72/anal3 inhomo field & FG KO 5 completed gen73/anal3 inhomo field & FG KO 5 completed gen74/anal3 inhomo field & FG KO 5 completed ===> 40 hours +++++++++++++++++++++++++++++++++++ break for tree summing and fitting +++++++++++++++++++++++++++++++++++ Program planned on April 20, 2004: ================================== gen76 Cloud muons 12 completed gen76/anal1 march 2004 FG KO 6 completed set18/anal1 9 completed 2002 cloud muons set19/anal1 9 not started low priority 2003 surface muons set20/anal1 9 not started low priority 2003 surface muons set2/anal5 9 completed random plane positions and rotations set2/anal6 9 field map, all event types, fixed maxwidnow completed high priority set3/anal23 all event types, field map , fixed max window 9 completed high priority set10/anal2 DS plastic (missing runs) 4 completed high priority ===> 85 hours Program planned on April 21, 2004: ================================== gen77 Base set with same MP Spec as test sets 12 completed high priority (for new sets) gen57 Base set with same MP Spec as test sets 12 completed high priority (for old sets) gen77/anal1 standard analysis 6 completed high priority gen57/anal1 standard analysis 6 completed high priority gen78 1/2 nominal beam rate 12 completed medium priority gen78/anal1 standard analysis 6 completed gen79 quadruple muon rates only 12 completed high priority gen79/anal1 standard analysis 6 not started gen80 quadruple positron rates only 12 completed high priority gen80/anal1 standard analysis 6 not started ====> 60 hours Program planned for the week of May 3, 2004: ============================================ gen66/anal2 4x beam rate analyzed with fixed 6 completed high priority maxwindowlength gen77/anal3 fixed window length non-uniform field 6 completed high priority and all event types gen70/anal8 randomized plane z positions 6 in progress high priority gen82 pressure lowered by 10% in the FFCARDS 12 completed high priority (Appropriate STRs not used) gen82/anal1 standard analysis 6 completed high priority (not all files generated/analyzed - superceded) gen70/anal9 randomized wire spacing 6 not started medium priority gen61/anal3 analysis with non uniform field 6 not started gen70/anal10 200 micron resolution 6 not started low priority gen70/anal11 50 micron resolution 6 not started low priority gen83 pressure lowered by 5% in the FFCARDS 12 completed high priority (Appropriate STRs not used) (no all files generated - preceded) gen83/anal1 not needed ===> 60 hours Program planned for the week of May 10, 2004: ============================================ gen81 B2+10G 12 completed gen81/anal1 standard analysis 12 completed gen84 B2-10G 12 completed gen84/anal1 standard analysis 12 completed gen85 temperature lowered by 10% 12 completed gen85/anal1 standard analysis 12 completed ===> 72 hours Program planned for the week of May 19, 2004: ============================================ set9/anal4 (DS Al) All event types non-uniform field and fixed max window 14 in progress high priority gen86 DS lucite 14 not started high priority gen86/anal1 All event types non-uniform field and fixed max window 14 not started high priority gen87 change resolution in MC 14 not started high priority gen87/anal1 All event types non-uniform field and fixed max window 14 not started high priority gen88 DS Al 14 in progress high priority gen88/anal2 All event types non-uniform field and fixed max window 14 not started high priority ===> 98 hours Program planned for the week of May 25, 2004: ============================================ gen89 standard set with VCIN card off 14 not started high priority gen89/anal1 All event types non-uniform field and fixed max window 14 not started high priority set3/anal24 testing new code 14 not started high priority set11/anal3 testing new code with high rate data 14 not started high priority set21/anal1 testing new code with low rate data 14 not started high priority gen92 pre-oct beam tune w/ 2002 polarization 14 not started high priority and geometry ===> 84 hours Last update: May 25, 2004 by Maher Quraan.